Project description¶
The FMC DEL 1ns 4cha delay module will take in a TTL trigger signal and will send it out to four different outputs. The delay from the trigger input to each of the outputs can be set independently in a range from 500 ns to 120 seconds. It is implemented using a dedicated time-to-digital converter IC from the European company Acam.
Top view of the FMC Delay card with SMC connectors. Final design will use LEMO 00 connectors
Bottom view
Functional system specifications¶
Technical specification¶
- Baseline solution: TDC at the inputs followed by coarse count in the FPGA and fine delay chips at the outputs. To be considered for improving jitter: monolithic FFs in the FMC, before the fine delay chips. Continuous calibration of fine delay chips might be needed to compensate for Process-Voltage-Temperature (PVT) effects. The timebase is from a local TCXO on FMC card and needs calibration. The 4ppm accuracy will only be reached when used on a White Rabbit enabled FMC carrier.
Detailed project information¶
- Official production documentation (schematics, PCB, etc.): EDMS: EDA-02267
- Card aka FMC6 and Fine Delay
- LHC Equipment name: CFFIB
- Controls Configuration Database entry
- Controls EDMS page
Contacts¶
Commercial producer¶
General question about project¶
- Erik van der Bij - CERN
Project Status¶
| Date | Event |
|---|---|
| 22-04-2010 | Start working on project. |
| 30-04-2010 | First meeting with N. Voumard to fine-tune functional specs. |
| 20-05-2010 | Second functional specs meeting with the ABT team. |
| 11-06-2010 | Order 4384595 made for design of the module. |
| 15-06-2010 | Final functional specification review meeting held. Resulted in minor modifications. |
| 30-06-2010 | Technical specification draft finished. |
| 17-08-2010 | First schematics review held. ReviewFineDelayFMC17082010 |
| 03-09-2010 | Schematics revised. Waiting for a new design review. |
| 10-11-2010 | Second schematics review held. ReviewFineDelayFMC10112010 |
| 12-11-2010 | Comments on review received. Re-commented on it. FMC10112010_improvements v5 |
| 25-11-2010 | Updated schematics and comments received. ReviewFineDelayFMC10112010_improvements |
| 25-11-2010 | Comments on updated schematics. ReviewFineDelayFMC25112010 |
| 30-11-2010 | Updated schematics and comments received. ReviewFineDelayFMC25112010_improvements |
| 13-12-2010 | First version of PCB layout expected by 17 December. |
| 14-01-2011 | Spec change for minimum delay: 500 ns. PCB layout almost finished, waiting for some symbols. |
| 18-01-2011 | PCB layout received. Review on 19-01-2011. |
| 18-01-2011 | Changelog for the PCB/schematics published: Changelog_19012010 |
| 20-01-2011 | PCB review held. V1 layout ready (SVN revision: 18) Changelog_20012011 |
| 28-01-2011 | Empty PCB should arrive on 1 February. Requested design office to review files. |
| 03-02-2011 | Prototype PCB assembled and ready for HDL development. ID EEPROM works. |
| 14-02-2011 | Design being reviewed by CERN's design office. |
| 21-02-2011 | HDL development on-going. |
| 02-03-2011 | Returned corrections in schematics to design office. |
| 18-03-2011 | Design checked and available in EDMS. |
| 19-04-2011 | Rather high jitter in prototype. Will improve layout of supply to ACCAM chip. |
| 05-05-2011 | V2 schematics and layout available for review: Changelog_05052011 |
| 06-05-2011 | V2 review held. Reduce number of R values, no large ceramic C, 20 MHz osc instead of 25 MHz. |
| 08-06-2011 | Files sent to CERN's design office for review and front-panel design. |
| 14-07-2011 | V2 design ready. Will produce 4 prototypes, after correcting OHL licence and removal of CERN logo. |
| 16-08-2011 | PCB ready by 19-08-2011. Assembly can start. |
| 31-08-2011 | Received assembled prototype of V2. |
| 02-09-2011 | V2 works. |
| 16-11-2011 | V2 demoed on SPEC. Considering changing output driver to have less cross-talk. |
| 09-01-2012 | V3 proto with changed output driver being tested. Preparing price enquiry. |
| 26-01-2012 | Price enquiry sent out. Deadline 24 February. 40 cards expected by 24 August. |
| 03-02-2012 | In parallel assemble 10 boards for urgent project. |
Erik van der Bij - 3 February 2012