Production
Template Technical Specification for assembled PCB products
- Technical Specification for the Supply of ACME_1 (EDA-02063) boards
- Specifies quality standards for PCB production, assembly, testing methods, packaging etc.
- Used and proven with the production of several Open Designs made by CERN.
- Corresponding Delivery schedule Gantt chart
- _This technical specification concerns the supply of 100 assembled
and tested ACME_1 printed circuit boards, also known as EDA-02063
boards.
The delivery of the pre-series of 20 boards is required to be within 15 weeks following placement of the contract, while the remaining 80 boards are required to be delivered within 8 weeks after ACME’s acceptance of the pre-series._ - §2.2 Deliverables Included in the Supply
The boards to be manufactured are fully described in the Manufacturing File provided by ACME (see 4.3). This file, downloadable from ACME’s Engineering Data Management System (EDMS), contains Printed Circuit Board (PCB) information, parts lists, component placement drawings, mechanical drawings and circuit diagrams.
The supply of the boards shall include:- The purchase of the components and materials according to the BOM;
- The manufacturing and assembly of the PCBs followed by testing;
- The manufacturing of mechanical parts;
- The assembly of the different parts;
- The final functional testing of the boards;
- The test results;
- The delivery to ACME (where included).
Please contact Erik van der Bij, CERN for details about this template.
Documentation required on delivery
Based on the technical specification that we use for Open Hardware
cards, we expect a number of reports with a delivery.
These reports allow us to verify if the delivered product complies to
the specification.
- Conformity of PCB production quality (coming from the subcontractor)
- Conformity of PCB assembly quality (inspection report, e.g. IPC-610)
- Conformity of ionic residues (IPC/EIA J-STD-001, Cleanliness Designator C-22 & section 8.3.6), tested on 10% of the boards
- Conformity of mechanics (visual inspection report)
- Result of Production Test
- Certificate of Conformity of the whole product
Erik van der Bij - 14 December 2015