Switch Planning for 2010
This is a quick description of the work packages for getting a first version of the WR switch by the end of 2010, with basic switching capabilities and good timing. The following explanations and task numbers refer to the attached Gantt chart: attachment:wrswitch2010.pdf
1. General Specs
1.1. Informal WR spec
This is a not-very-long document telling developers what WR is and how one goes about designing a node. In particular, it describes the enhanced PTP mechanism.
1.2. Basic switch spec
Here we decide which features of the relevant IEEE standards apply to this first version of the switch, how many ports, and other miscellaneous features such as basic switch management through SNMP.