Users of WR Technology
Committed
- CERN
- CNGS Timing for neutrino measurements (May 2012)
-
DESY
- Gamma-Ray and Cosmic-Ray experiment HiSCORE-EA at the Tunka-133 Cherenkov EAS-Array (2012/13). (R. Wischnewski, Feb 2012)
- GSI Helmholtzzentrum für Schwerionenforschung GmbH
- LHAASO
- A Future Project at Tibet: The Large High Altitude Air Shower Observatory (LHAASO)
- Tsinghua University, China (Feb 2011)
- Timing system of LHAASO (Large High Altitude Air Shower
Observation) project Deploying 10,000 detectors over 1 square km
at Tibet.
- Abstract Sub-nanosecond Timing System Design and Development for LHAASO Project, ICALEPCS 2011 conference
- September 2012: "Supported by these experimental proof, the LHAASO project has passed the technical review on the WR timing distribution plan consists of 4 layers of WR switches (461 in total) covering 6880 nodes. It would be the first demonstration of WR in large scale cosmic ray detector arrays to provide both timing link and synchronous data acquisition network to every detector front-end. We are planning to deploy a small portion of array (40-50 nodes) in Tibet early in next year using cute-wr ."
- Design of Compact Universal Timing Endpoint Based on White Rabbit Open Hardware FMC card.
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
- SuperGPS through optical networks
- Partners
- Dutch Metrology Institute (VSL Delft )
- Dutch Ministry of Infrastructure and Environment (Rijkswaterstaat)
Considering/evaluating
-
Allied Partners
- Evaluating deterministic ethernet solutions for critical infrastructure networks and applications (July 2012)
- " Cherenkov Telescope Array":http://www.cta-observatory.org/
- ESS Bilbao
- ITER timing system (F. Di Maio, Feb 2012)
-
KM3NET
- European deep-sea research infrastructure, hosting a neutrino telescope
- Michigan State University
-
NICA, accelerator of JINR at
Dubna (30/8/11)
- Deliver control information to different parts of accelerator over the Ethernet synchronously with a subnanosecond accuracy.
- Evalutating WR cores: Y.Kozhevnikov and PhD student A.Mukhamatnabeev.
Thinking
- ESS Lund
- EISCAT
- SuperB
- LNLS (Brazilian Synchrotron Light Laboratory) is seriously thinking on using WR for the fast orbit feedback and for the timing system of Sirius.