Users of WR Technology
Committed
- CERN
- CNGS Timing for neutrino measurements (May 2012)
-
DESY
- Gamma-Ray and Cosmic-Ray experiment HiSCORE-EA at the Tunka-133 Cherenkov EAS-Array (2012/13). (R. Wischnewski, Feb 2012)
- GSI Helmholtzzentrum für Schwerionenforschung GmbH
- LHAASO
- A Future Project at Tibet: The Large High Altitude Air Shower Observatory (LHAASO)
- Tsinghua University, China (Feb 2011)
- Timing system of LHAASO (Large High Altitude Air Shower
Observation) project Deploying 10,000 detectors over 1 square km
at Tibet.
- Sub-nanosecond Timing System Design and Development for LHAASO Project Slides, Article: ICALEPCS 2011 conference
- Design of Compact Universal Timing Endpoint Based on White Rabbit Open Hardware FMC card.
- The LHAASO project has passed the technical review on the WR timing distribution plan consists of 4 layers of WR switches (461 in total) covering 6880 nodes of KM2A. It would be able to provide both a timing link and synchronous data acquisition network to every detector front-end for a trigger-less scheme. For 2013 it is planned to deploy a small portion of array (40-50 nodes) in Tibet using cute-wr . (Sept.2012)
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
- SuperGPS through optical networks
- Partners
- Dutch Metrology Institute (VSL Delft )
- Dutch Ministry of Infrastructure and Environment (Rijkswaterstaat)
Considering/evaluating
-
Allied Partners
- Evaluating deterministic ethernet solutions for critical infrastructure networks and applications (July 2012)
- " Cherenkov Telescope Array":http://www.cta-observatory.org/
- ESS Bilbao
- ITER timing system (F. Di Maio, Feb 2012)
-
KM3NET
- European deep-sea research infrastructure, hosting a neutrino telescope
- Michigan State University
-
NICA, accelerator of JINR at
Dubna (30/8/11)
- Deliver control information to different parts of accelerator over the Ethernet synchronously with a subnanosecond accuracy.
- Evalutating WR cores: Y.Kozhevnikov and PhD student A.Mukhamatnabeev.
Thinking
- ESS Lund
- EISCAT
- SuperB
- LNLS (Brazilian Synchrotron Light Laboratory) is seriously thinking on using WR for the fast orbit feedback and for the timing system of Sirius.
1 October 2012